As a full systems driveline provider, our industrial team at MIT is proud to announce the successful implementation of a state-of-the-art hydraulic and control solution for a mechanical decoking and in-line tube inspection company. This project marks a significant milestone in our journey to deliver unparalleled operational efficiency to the industry.
A Leap in Decoking Technology
Understanding the critical need for a system that could seamlessly integrate with current technologies, we accepted the challenge of designing and delivering a high-performance hydraulic solution enhanced by a sophisticated control system. The result is a seamless enhancement of our client’s decoking processes.
Customised Solutions for Maximum Efficiency
– Core Hydraulic System
- AM375 Pump Drive Unit: At the heart of our solution lies the Twin Disc AM375 pump drive unit, meticulously chosen to power the hydraulic system with reliability and strength.
– Bespoke Hydraulic Engineering
- Tailored System Design: Our engineering team developed a customised hydraulic solution that was fine-tuned to align with the client’s specific operational needs.
-Advanced Control System
- Dual Touch Screen Controls: We integrated an advanced control system featuring twin touch screen controls, ensuring efficient operation and enabling real-time system monitoring.
Dedicated On-Site Support
- Expert Engagement: Alan Weir, our expert sales engineer, delivered essential on-site support throughout the assembly phase, ensuring every component was perfectly synchronised.
Commissioning and Testing: The Path Ahead
With the successful assembly of our advanced hydraulic and control system, our team is now focused on the upcoming critical phases of commissioning and testing.
-Meticulous Commissioning
- Scheduled for August: We have outlined a detailed commissioning program set to commence in August. This stage is crucial for validating the performance and reliability of our solution in real-world operational conditions.
-Rigorous Testing
- Initial Deployment in September: Following the commissioning, the system’s initial on-site deployment is planned for September. This will be a pivotal moment, marking the system’s full integration within our client’s operations.
Our commitment to excellence ensures that every step, from the initial design to the final deployment, adheres to the highest standards of quality and precision. We look forward to the successful completion of this project and the enhanced efficiency it will bring to our client’s decoking processes.